TM 9-2350-238-34-2
2-36. MAINTENANCE OF COUNTERBALANCE MANIFOLD ASSEMBLY (CONT)
REASSEMBLY/INSTALLATION (CONT)
9
10
11
12
13
14
15
16
Install two new preformed packings (15)
and new preformed packing (16) in boom
cylinder pressure relief valve (17).
Install boom cylinder pressure relief valve
(17) and four socket head capscrews
(18) on multiple connector (4).
Install two new preformed packings (19)
and new preformed packing (20) in pres-
sure relief valve (21).
Install pressure relief valve (21) and four
socket head capscrews (22) on multiple
connector (4).
Install two new preformed packings (23)
in boom cylinder hydraulic shut-off valve
(24).
Install boom cylinder hydraulic shut-off
valve (24) and four socket head cap-
screws (25) on multiple connector (4).
Install two new preformed packings (26)
and two new preformed packings (27) in
pressure relief valve (28).
Install pressure relief valve (28) and six
socket head capscrews (29) on multiple
connector (4).
2-160