TM 9-2350-238-34-2
5 Install pressure relief safety relief valve
(6), pipe plug (7), and four pipe plugs (8)
in reaction end support (9).
6 Install reaction end support (9) on cable
reel (1).
7 Install thrust ring spacer (10) on stage
three boom winch carrier assembly (11).
2-55