TM 9-2350-238-34-2
2-25. MAINTENANCE OF STAGE ONE BOOM WINCH CARRIER ASSEMBLY (CONT).
REASSEMBLY (CONT)
4 Install thrust ball bearing (4) and sun gear
shift rod lock hexagon plain nut (5) on
brake rod (6). Stake sun gear shift rod
lock hexagon plain nut.
5 Install brake rod
secure with sun
(7).
(6) in carrier (2) and
gear bearing retaining ring
6 Install sun gear shift rod lock flat washer
(8) in carrier (2).
2-74