TM 9-2350-238-34-2
2-25. MAINTENANCE OF STAGE ONE BOOM WINCH CARRIER ASSEMBLY (CONT).
REASSEMBLY (CONT)
10 Install spur gear (14) in carrier (2). Mesh
teeth of spur gear with teeth of three
spur gears (11 ) inside carrier.
11 Install sun gear shift rod lock flat washer
(15) and carrier brake ring (16) in carrier
(2).
12 Install eight machine bolts (17). Tighten
machine bolts and install new Iockwire
(18) to carrier brake ring (16).
2-76