TM 9-2350-238-34-2
2-26. MAINTENANCE
DISSASSEMBLY (CONT)
OF STAGE TWO BOOM WINCH CARRIER ASSEMBLY (CONT).
2 Using hammer and drift, remove three
planet gear pins (3) from carrier (2).
3 Remove three spur gears (4) from carrier
(2).
4 Remove two pinion gear flat washers (5)
from each of three spur gears (4).
5 Using arbor press, remove one roller bear-
ing (6) from each of three spur gears (4).
2-78