TM 9-2350-256-10
2-11. OPERATING PROCEDURES-Continued.
(d)
Have operator pay out
hoist cable (9). Pass
cable over top of crew
compartment
and
under
boom
cross
members (10). Keep
hoists cables between
staylines (11).
(e)
Pass cable (9) up and
over left side of boom
support (12).
(f)
Bring cable (9) back, going up and over left boom pulley (13).
(g)
Pull cable (9) forward and lay it on the lower pulley (14) of 25-ton (22.7-metric-ton) snatch block from
left to right.
(h)
If rigging a two-part line using 10-ton (9.1-metric-ton) snatch block, close boom safety latch, hook up
line to boom dead man (see para. 2-11e(2) m) and close block.
NOTE
If rigging a 25-ton (22.7-metric-ton) snatch block with a four-part line, continue
with following steps.
(i)
Bring cable (9) back over upper boom cross member (15) and down under boom pulley assembly
(16).
(j)
Pull cable (9) up and over right boom pulley (17).
2-136