TM 9-2350-256-34
0023 00
2.
Clean all metal parts with cleaning compound or mineral spirits paint thinner. Use a wire brush where necessary and dry
with compressed air.
Inspection-Acceptance and Rejection Criteria
1.
Inspect engine, transmission, wiring harness, and all accessories for breaks, leaks, damage, excessive wear, missing parts,
or unserviceable condition.
Repair or Replacement
1.
Refer to TM 9-2815-220-34 for engine repair or TM 9-2520-215-34 for transmission repair. If the engine or transmission is
to be replaced, record the action on DA Form 2408-10, Equipment Component Register.
2.
Refer to TM 9-2350-256-20 for instructions on repairing the main engine and transmission accessories removed for
Assembly
NOTE
The following procedure contains instructions for connecting the main engine to the transmission.
1.
Install sling on transmission (17).
2.
Install gasket (19) between transmission (17) and engine (18).
NOTE
When installing 24 nuts, do not tighten until all nuts have been installed.
0023 00-4