TM 9-2350-256-34
0028 00
11. Connect fire extinguisher tube (7).
12. Move line (18) into position and install clamp (17), lockwasher (16), and screw (15).
13. Move fuel valve and fittings (13) and two fuel lines (14) into position, tighten nut (12), install spring pin (11).
14. Connect two fuel lines (10), air vent line (9), and sending unit lead (8).
15. Install fire extinguisher tube (7), clamp (6), lockwasher (5), and screw (4).
16. Install clamp (3), lockwasher (2), and screw (1).
END OF WORK PACKAGE
0028 00-7/8 blank