TM 9--2350--292--10
0047 00--5
OPERATE BOOM -- CONTINUED
0047 00
RIGGING BOOM -- CONTINUED
9. Bring cable under and around outside (rotating) boom pulley (16).
10. Pull cable forward and lay it in upper pulley (17) of the 35--ton (31,780 kg) hook block (4) as illustrated.
11. Bring cable back over upper cross--member (18) and down under middle boom pulley (19).
16
19
4
17
18