TM 9--2350--292--10
0047 00--6
OPERATE BOOM -- CONTINUED
0047 00
RIGGING BOOM -- CONTINUED
12. Bring cable forward, around middle boom pulley (19).
13. Bring cable forward and lay it in lower pulley (20) of the 35--ton (31,780 kg) hook block (4) as illustrated.
14. Bring cable back over upper cross--member (18), and under outside stationary pulley (21).
20
4
TOP
SIDE
21
19
18