TM 9--2350--292--10
0101 00--26
PREVENTIVE MAINTENANCE CHECKS AND SERVICES INCLUDING
LUBRICATION INSTRUCTIONS -- CONTINUED
0101 00
TABLE 3 PREVENTIVE MAINTENANCE CHECKS AND SERVICES, AFTER--CONTINUED
Item No.
Not Fully Mission
Capable If:
CREWMEMBER
Procedure
LOCATION
Item toCheck/
Service
Interval
COMMANDER
5
After
Smoke Grenade
Launcher
Controls
a. Indicator light comes on when
ARM/OFF switch is set to ON.
b. Check electrical connector to launcher
control for frayed wires, tears and any
damage rendering the cable unserviceable.
c. Clean smoke grenade launcher tubes
(WP 0126 00).
LAUNCHER
TUBES
RIGHT
PUSHBUTTON
ARMING
SWITCH
PUSHBUTTON UNIT
LEFT
PUSHBUTTON
INDICATOR
LIGHT
LAUNCHER
TUBES