TM 9--2350--292--20--1
0264 00--3
BILGE PUMP POWER LOAD RELAY, CIRCUIT BREAKER AND MOUNTING
PLATE REPLACEMENT -- CONTINUED
0264 00
Installation
1. Install mounting plate (15) with two screws (13) and two new lockwashers (14).
2. Install bilge pump circuit breaker (10) with two screws (11) and two new lockwashers (12).
3. Install wiring harness 4W136 terminal T1 (8) and lead assembly 4W140 wire 450A (7) on bilge pump circuit break-
er (10) with two lockwashers (6), two screws (5) and two lockwashers (9).
Figure 78
15
14
13
10
11
12
9
9
5
5
6
6
8
7