TM 9--2350--292--20--1
0187 00--91
0187 00
PREVENTIVE MAINTENANCE CHECKS AND SERVICES INCLUDING
LUBRICATION INSTRUCTIONS -- CONTINUED
TABLE 3 PREVENTIVE MAINTENANCE CHECKS AND SERVICES
INCLUDING LUBRICATION INSTRUCTIONS, SEMIANNUALLY -- CONTINUED
ITEM
NO.
NOT FULLY
MISSION
CAPABLE
IF:
PROCEDURE
LOCATION
ITEM TO
CHECK/
SERVICE
INTERVAL
SEMIANNUALLY
INTERIOR
14
Main Winch --
Continued
e. Check to ensure wire rope wedge (6) is
properly installed in drum (2).
WARNING
f. Clean wire rope (5) with dry--cleaning
solvent (item 1, WP 0716 00).
LUBRICANTS/
COMPONENTS
REFILL
CAPACITY
EXPECTED TEMPERATURE*
+40°F to --10°F
(+4°C to --23°C)
Above +32°F
(Above 0°C)
0°F to --65°F
(--17°C to --54°C)
OIL:
Lubricating Oil,
OE/HDO
MIL--L--21024
As
Required
*For Arctic Operation, refer to FM 9--207
ALL TEMPERATURES
g. Lubricate wire rope (5) with OE/HDO
and allow to drain.
h. Tighten any loose mounting screws
and hydraulic lines.
2
5
6