TM 9--2350--292--20--2
0418 00--1
STAYLINE TREE TRAY AND HOOK BLOCK RETAINER REPLACEMENT
0418 00
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit (item 1, WP 0717 00)
Endless sling (item 24, WP 0717 00)
Suitable lifting device (150 lbs (68.1 kg) min cap)
Materials/Parts
Cotter pins (2) (item 30, WP 0718 00)
Lockwashers (3) (item 12, WP 0718 00)
Equipment Conditions
Boom raised to full forward position
(TM 9--2350--292--10)
Personnel Required
Three
References
TM 9--2350--292--10
Removal
1. Remove two cotter pins (1), two nuts (2) and two screws (3) securing stayline tree tray (4) to engine deck assem-
bly (5). Discard cotter pins.
2. Remove three screws (6) and three lockwashers (7) securing stayline tree tray (4) to engine deck assembly (5).
Discard lockwashers.
WARNING
3. Attach endless sling and suitable lifting device to stayline tree tray (4), remove stayline tree tray (4) from engine
deck assembly (5).
4. Inspect parts for damage and replace as required.
1
2
3
4
5
6
7
FORWARD