TM 9--2350--292--20--2
0425 00--1
ENGINE DECK BASE ASSEMBLY REPAIR
0425 00
THIS WORK PACKAGE COVERS:
Disassembly, Assembly
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit (item 1, WP 0717 00)
Hoisting beam (item 64, WP 0717 00)
Suitable lifting device (2500 lbs (1135 kg) min cap)
Materials/Parts
Dry--cleaning solvent (item 1, WP 0716 00)
Adhesive (item 35, WP 0716 00)
Fibrous glass felt (item 220 , WP 0718 00)
Lockwashers (32) (item 139, WP 0718 00)
Lockwasher (item 78, WP 0718 00)
Rubber seals (2) (item 221, WP 0718 00)
Rubber seals (2) (item 224, WP 0718 00)
Rubber seals (2) (item 225, WP 0718 00)
Rubber seals (2) (item 226, WP 0718 00)
Rubber seals (2) (item 227, WP 0718 00)
Rubber seal (item 228, WP 0718 00)
Rubber seal (item 229, WP 0718 00)
Rubber seal (item 223, WP 0718 00)
Solvent (item 91, WP 0716 00)
Adhesive (item 18, WP 0716 00)
Materials/Parts--Continued
Rubber seal (item 222, WP 0718 00)
Equipment Conditions
Engine deck assembly removed and
blocked (WP 0417 00)
Engine deck cover assembly removed
(WP 0423 00)
Center exhaust doors removed (WP 0424 00)
Engine exhaust deflector doors removed
(WP 0421 00)
Engine exhaust deflector removed (WP 0420 00)
Hoist boom rest assembly removed
(WP 0427 00)
Exhaust access doors removed (WP 0426 00)
Personnel Required
Three
Disassembly
1. Remove 32 screws (1), 32 lockwashers (2), 24 flat washers (3) and two retainers (4 and 5) from base assembly
(6). Discard lockwashers.
Figure 204
1
1
2
2
3
4
5
6