TM 9--2350--292--20--2
0532 00--2
PERSONNEL HEATER EXHAUST HOSE/TUBE ASSEMBLY AND INSULATION
BLANKET REPLACEMENT -- CONTINUED
0532 00
Removal--Continued
2. Remove nonelectrical wire (5) and insulation blanket (6) from exhaust hose (7). Discard nonelectrical wire.
3. Remove four screws (8), four lockwashers (9), exhaust hose (7) and gasket (10) from inner bulkhead. Discard
lockwashers and gasket.
4. Inspect parts for damage and replace as required.
Installation
1. Install new gasket (10) and exhaust hose (7) with four screws (8) and four new lockwashers (9) on inner bulk-
head.
2. Install insulation blanket (6) on exhaust hose (7) and secure with new nonelectrical wire (5).
3. Install new gasket (4) and exhaust tube (3) with two screws (1) and two new lockwashers (2) on outer bulkhead.
4. Operate personnel heater (TM 9--2350--292--10) and check for exhaust leaks. Make repairs as necessary.
3
1
2
4
6
7
8
9
10
5
NOTE
FOLLOW--ON MAINTENANCE:
Install APU auxiliary housing, if removed (WP 0414 00)
Install APU cooling air shield, if removed (WP 0413 00)
Lower boom (TM 9--2350--292--10)
END OF TASK