• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Removal - TM-9-2350-292-20-2_724
MAIN HYDRAULIC PUMPS ASSEMBLY AND POWER TAKEOFF (PTO) CLUTCH REPLACEMENT

TM-9-2350-292-20-2 Recovery Vehicle Heavy Full-Tracked: M88A2 (NSN 2350-01-390-4683) (EIC:ACQ) Manual
Page Navigation
  685    686    687    688    689  690  691    692    693    694    695  
TM 9--2350--292--20--2 POWER TAKE--OFF (PTO) SHAFT REPLACEMENT -- CONTINUED 0544 00 Installation NOTE Perform step 1 only if adapter and gasket are being re- placed. 1.   Install adapter (10) and new gasket (15) with eight screws (13) and eight new lockwashers (14). 2.   Install PTO shaft assembly (11) through bulkhead access opening (12) with slip yoke (8) towards the engine. 3.   Slide boot (2) over PTO shaft assembly (11) and secure boot (2) to adapter (10) with clamp (9). 4.   Secure flange (7) to PTO clutch assembly (3) with four screws (5) and four flat washers (6). Torque screws (5) to 97--116 lb--ft (132--157 NSm). 5.   Install new nonelectrical wire (4) through four screws (5) and secure using double--twist method. CAUTION To avoid shaft damage, make sure arrows on slip yokes are aligned. 6.   Secure boot (2) to PTO clutch assembly (3) with two clamps (1). Figure 292 3 1 2 9 13 14 10 15 12 11 8 4 5 6 7 NOTE FOLLOW--ON MAINTENANCE: Install support (18) and subfloor plate #25, #26 and #27 (WP 0454 00) Install powerpack (WP 0188 00) Install engine deck grilles (TM 9--2350--292--10) END OF TASK 0544 00--3/4 blank







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.