TM 9--2350--292--20--2
0562 00--4
HYDRAULIC CONTROL VALVES REPLACEMENT -- CONTINUED
0562 00
Installation--Continued
7. Install DCV system selector valve (13) and four new preformed packings (14) on manifold assembly (5) with four
screws (12).
8. Install spade DCV valve (8), four new preformed packings (11) and five new preformed packings (10), on manifold
assembly (5) with four screws (9).
9. Install lever (7) on spade DCV valve (8) with new spring pin (6).
10. Install boom DCV valve (2), four new preformed packings (4) and five new preformed packings (3) on manifold
assembly (5) with four screws (1).
11. Install hydraulic control valve manifold assembly hydraulic lines and fittings (WP 0577 00).
12. Install hydraulic control valves handles (WP 0561 00) and spade control valve rod and handle
(WP 0519 00).
13. Start engine, operate hydraulic controls and check for leaks (TM 9--2350--292--10).
14. Remove hydraulic control valves handles (WP 0561 00) and spade control valve rod and handle
(WP 0519 00).
1
2
6
7
11
13
14
5
3
4
10
12
8
9
NOTE
FOLLOW--ON MAINTENANCE:
Install hydraulic control valve manifold shields and spade
control valve rod and handle (WP 0519 00)
Operate hydraulic components to ensure
proper operation (TM 9--2350--292--10)
END OF TASK