LO 9-2350-256-12
LUBRICATION
ORDER
(Supersedes LO 9-2350-256-12 July 1976)
28 February 1986
RECOVERY VEHICLE, FULL-TRACKED
MEDIUM, M88A1
NOTE
Intervals (on-condition or hard lime) and the related man-hour
times are based on normal operation. The man-hour time speci-
fied is the time you need to do all the services prescribed for a
Always install dust caps on fittings
after lubrication procedures.
particular interval. On-condition (OC) oil sample intervals shall
be applied unless changed by the Army Oil Analysis Program
(AOAP) laboratory. Change the hard-time if your lubricants are
Clean parts with dry-cleaning solvent, type II (SD-2) or equiva-
contaminated or if you are operating the equipment under
Ient. Dotted arrow points indicate lubrication on both sides of
adverse operating conditions, including longer-than-usual oper-
the equipment. The lowest level of maintenance authorized to
sting hours. The hard-time interval may be extended during
Iubricate a point is indicated by one of the following symbols as
periods of low activity. If extended, adequate preservation pre-
appropriate: Operator/Crew (C); and Organizational Mainte-
cautions must be taken. Hard-time intervals will be applied in
nance (O).
the event AOAP laboratory support is not available.
Reporting errors and recommending Improvements. You can
help improve this manual. If you find any mistakes or if you
WARNING
know of a way to improve the procedures, please let us know.
Mail your letter or DA Form 2028 (recommended Changes to
Dry-cleaning solvent, type II used to
Publications and Blank Forms) directly to: Commander, U.S.
clean parts, is potentially dangerous
Army Tank-automotive and Armaments Command, ATTN:
to personnel and property. Do not
AMSTA-IM-MMAA, Warren, MI 48397-5000. A reply will be fur-
use near open flame or excessive
nished to you.
heat. Flash point of solvent is 138F
(58.8C).
TOTAL MAN-HOURS
MAN-HOURS
INTERVALS
7.3
D
11.3
M
9.0
S
1.0
A
5.8
OC
24.0
After fording
*If AOAP support is not available and hard-time
Intervals are used, 2 man-hours will be required for
each 25-hour period or monthly (whichever comes
first); additionally, semiannual labor requirements
wiII Increase by 2.5 man-hours.
CARD 1 of 38
Change 1
LO 9-2350-256-12