TM 1-1680-320-13&P
0036 00
5. Connect umbilical cable (7) through bracket (8).
6. Install control pendant cable (13) onto boom position support assembly (14) using clamp (15), screws (16 and
17), nut (18) and bracket (19).
7. Connect control pendant cable (3) to control panel assembly.
8. Connect control pendant cable (13) to control pendant (11) by tightening connector (12).
End of Work Package
0036 00-9/(0036 00-10 blank)