3-12. Personnel Stabilized Body Extraction System.
This task covers:
a. Inspect
b. Service
c.
Repair
d. Replace
INITIAL SETUP
Tools
Personnel Required
Parachute Rigger MOS 43E
Materials/Parts
Equipment Conditions
Unpacked. Laid out on table.
NOTE
There are seven separate items in this system. Each item has Initial Setup requirements and
Maintenance Procedures presented in separate paragraphs (3-13 through 3-23 below).