Home
Download PDF
Order CD-ROM
Order in Print
CHAPTER 1 INTRODUCTION - TM-9-2350-238-34-2_10
DESTRUCTION OF ARMY MATER- IEL TO PREVENT ENEMY USE (CONT)
Capabilities and Features
EQUIPMENT DATA (CONT)
CHAPTER 2 DIRECT SUPPORT MAINTENANCE INSTRUCTIONS
Section I. REPAIR PARTS, SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
DIRECT SUPPORT TROUBLESHOOTING SYMPTOM INDEX
Table 2-1. DIRECT SUPPORT TROUBLESHOOTING
CAB TRAVERSES SLUGGISHLY IN EITHER DIRECTION
TOW WINCH
TOW WINCH PAYS OUT, BUT WILL NOT PAY IN
TOW WINCH OPERATES SLUGGISHLY WHEN PAYING IN.
BOOM WINCH PAYS IN, BUT WILL NOT PAY OUT.
BOOM WINCH OPERATES SLUGGISHLY IN EITHER DIRECTION
BOOM RAISES BUT WILL NOT LOWER.
BOOM DROPS WHEN HOLDING LOAD IN NEUTRAL POSITION
LEVEL WIND
LEVEL WIND TRAVERSES CAB SLUGGISHLY.
WINCHES, BOOM, AND TRAVERSING SYSTEM WILL NOT OPERATE.
Section Ill. MAINTENANCE OF HYDRAULIC LINES AND FITTINGS
TUBE REDUCER TO TUBE FITTING.
Section IV. DIRECT SUPPORT MAINTENANCE INSTRUCTIONS
LUBRICATION - TM-9-2350-238-34-2_32
TOUCHUP AND RECOATING
MAINTENANCE OF WINCH LEVEL WIND AND CONNECTING LINK SLIDE
DISASSEMBLY - TM-9-2350-238-34-2_35
DISASSEMBLY (cont) - TM-9-2350-238-34-2_36
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_37
INSPECTION/REPAIR - TM-9-2350-238-34-2_38
REASSEMBLY (CONT) - TM-9-2350-238-34-2_39
REASSEMBLY (CONT) - TM-9-2350-238-34-2_40
ADJUSTMENT - TM-9-2350-238-34-2_41
ADJUSTMENT (cont) - TM-9-2350-238-34-2_42
MAINTENANCE OF HYDRAULIC MOTOR
DISASSEMBLY - TM-9-2350-238-34-2_44
DISASSEMBLY (cont) - TM-9-2350-238-34-2_45
INSPECTION/REPAIR - TM-9-2350-238-34-2_46
REASSEMBLY - TM-9-2350-238-34-2_47
REASSEMBLY (cont) - TM-9-2350-238-34-2_48
REASSEMBLY (cont) - TM-9-2350-238-34-2_49
REASSEMBLY (cont) - TM-9-2350-238-34-2_50
MAINTENANCE OF BOOM AND WINCHVEHICLE DRUM WINCH
REMOVAL - TM-9-2350-238-34-2_52
INSPECTION/REPAIR - TM-9-2350-238-34-2_53
INSPECTION/REPAIR (cont) - TM-9-2350-238-34-2_54
MAINTENANCE OF PLANETARY (BOOM) WINCH
DISASSEMBLE
DISASSEMBLE (cont) - TM-9-2350-238-34-2_57
DISASSEMBLE (cont) - TM-9-2350-238-34-2_58
DISASSEMBLE (cont) - TM-9-2350-238-34-2_59
DISASSEMBLE (cont) - TM-9-2350-238-34-2_60
DISASSEMBLE (cont) - TM-9-2350-238-34-2_61
DISASSEMBLE (cont) - TM-9-2350-238-34-2_62
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_63
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_64
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_65
INSPECTION/REPAIR - TM-9-2350-238-34-2_66
REASSEMBLY - TM-9-2350-238-34-2_67
REASSEMBLY (cont) - TM-9-2350-238-34-2_68
REASSEMBLY (cont) - TM-9-2350-238-34-2_69
REASSEMBLY (cont) - TM-9-2350-238-34-2_70
REASSEMBLY (cont) - TM-9-2350-238-34-2_71
REASSEMBLY (cont) - TM-9-2350-238-34-2_72
REASSEMBLY (CONT) - TM-9-2350-238-34-2_73
REASSEMBLY (CONT) - TM-9-2350-238-34-2_74
REASSEMBLY (CONT) - TM-9-2350-238-34-2_75
ADJUSTMENT - TM-9-2350-238-34-2_76
MAINTENANCE OF WINCH CONTROL CYLINDER
DISASSEMBLY - TM-9-2350-238-34-2_78
INSPECTION/REPAIR - TM-9-2350-238-34-2_79
INSPECTION/REPAIR (cont) - TM-9-2350-238-34-2_80
REASSEMBLY (CONT)
MAINTENANCE OF STAGE ONE BOOM WINCH CARRIER ASSEMBLY
DISASSEMBLY - TM-9-2350-238-34-2_83
DISASSEMBLY (cont) - TM-9-2350-238-34-2_84
DISASSEMBLY (cont) - TM-9-2350-238-34-2_85
INSPECTION/REPAIR - TM-9-2350-238-34-2_86
REASSEMBLY (CONT) - TM-9-2350-238-34-2_87
REASSEMBLY (CONT) - TM-9-2350-238-34-2_88
REASSEMBLY (CONT) - TM-9-2350-238-34-2_89
MAINTENANCE OF STAGE TWO BOOM WINCH CARRIER ASSEMBLY
DISASSEMBLY - TM-9-2350-238-34-2_91
REASSEMBLY - TM-9-2350-238-34-2_92
REASSEMBLY (cont) - TM-9-2350-238-34-2_93
MAINTENANCE OF STAGE THREE BOOM WINCH CARRIER ASSEMBLY
INSPECTION/REPAIR - TM-9-2350-238-34-2_95
REASSEMBLY - TM-9-2350-238-34-2_96
MAINTENANCE OF BOOM AND WINCHCONTROL CYLINDERS AND AT- TACHING PARTS AND BOOM CONTROL CYLINDER ASSEMBLY
removal - TM-9-2350-238-34-2_98
REMOVAL (CONT) - TM-9-2350-238-34-2_99
REMOVAL (CONT) - TM-9-2350-238-34-2_100
REMOVAL (CONT) - TM-9-2350-238-34-2_101
REMOVAL (CONT) - TM-9-2350-238-34-2_102
DISASSEMBLY (CONT)
INSPECTION/REPAIR - TM-9-2350-238-34-2_104
REASSEMBLY (CONT) - TM-9-2350-238-34-2_105
REASSEMBLY (CONT) - TM-9-2350-238-34-2_106
REASSEMBLY (CONT) - TM-9-2350-238-34-2_107
INSTALLATION - TM-9-2350-238-34-2_108
INSTALLATION (CONT) - TM-9-2350-238-34-2_109
INSTALLATION (CONT) - TM-9-2350-238-34-2_110
BOOM DROP RATE TEST
BOOM DROP RATE TEST (cont) - TM-9-2350-238-34-2_112
BOOM DROP RATE TEST (cont) - TM-9-2350-238-34-2_113
BOOM DROP RATE TEST (cont) - TM-9-2350-238-34-2_114
BOOM DROP RATE TEST (cont) - TM-9-2350-238-34-2_115
MAINTENANCE OF BOOM AND WINCHTOW WINCH ASSEMBLY
removal - TM-9-2350-238-34-2_117
removal (cont) - TM-9-2350-238-34-2_118
removal (cont) - TM-9-2350-238-34-2_119
INSPECTION/REPAIR - TM-9-2350-238-34-2_120
INSTALLATION (CONT) - TM-9-2350-238-34-2_121
INSTALLATION (CONT) - TM-9-2350-238-34-2_122
INSTALLATION (CONT) - TM-9-2350-238-34-2_123
MAINTENANCE OF VEHICLE TOW DRUM WINCH
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_125
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_126
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_127
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_128
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_129
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_130
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_131
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_132
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_133
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_134
REASSEMBLY - TM-9-2350-238-34-2_135
REASSEMBLY (cont) - TM-9-2350-238-34-2_136
REASSEMBLY (cont) - TM-9-2350-238-34-2_137
REASSEMBLY (cont) - TM-9-2350-238-34-2_138
REASSEMBLY (cont) - TM-9-2350-238-34-2_139
REASSEMBLY (cont) - TM-9-2350-238-34-2_140
REASSEMBLY (CONT) - TM-9-2350-238-34-2_141
REASSEMBLY (CONT) - TM-9-2350-238-34-2_142
REASSEMBLY (CONT) - TM-9-2350-238-34-2_143
ADJUSTMENT - TM-9-2350-238-34-2_144
MAINTENANCE OF STAGE ONE CARRIER ASSEMBLY
DISASSEMBLY (cont) - TM-9-2350-238-34-2_146
INSPECTION/REPAIR - TM-9-2350-238-34-2_147
REASSEMBLY - TM-9-2350-238-34-2_148
REASSEMBLY (cont) - TM-9-2350-238-34-2_149
MAINTENANCE OF STAGE TWO CARRIER ASSEMBLY
DISASSEMBLY - TM-9-2350-238-34-2_151
INSPECTION/REPAIR - TM-9-2350-238-34-2_152
REASSEMBLY
MAINTENANCE OF STAGE THREE CARRIER ASSEMBLY
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_155
INSPECTION/REPAIR - TM-9-2350-238-34-2_156
REASSEMBLY - TM-9-2350-238-34-2_157
MAINTENANCE OF STAGE FOUR CARRIER ASSEMBLY.
DISASSEMBLY - TM-9-2350-238-34-2_159
DISASSEMBLY (cont) - TM-9-2350-238-34-2_160
INSPECTION/REPAIR - TM-9-2350-238-34-2_161
reassembly - TM-9-2350-238-34-2_162
reassembly (cont) - TM-9-2350-238-34-2_163
MAINTENANCE OF THREE-SPOOL DIRECTIONAL LINEAR VALVE
DISASSEMBLY - TM-9-2350-238-34-2_165
INSPECTION/REPAIR - TM-9-2350-238-34-2_166
TM-9-2350-238-34-2_167
REMOVAL/DISASSEMBLY - TM-9-2350-238-34-2_168
REMOVAL/DISASSEMBLY (cont) - TM-9-2350-238-34-2_169
REMOVAL/DISASSEMBLY (cont) - TM-9-2350-238-34-2_170
REMOVAL/DISASSEMBLY (CONT)
REASSEMBLY/INSTALLATION - TM-9-2350-238-34-2_172
REASSEMBLY/INSTALLATION (cont) - TM-9-2350-238-34-2_173
REASSEMBLY/INSTALLATION (cont) - TM-9-2350-238-34-2_174
REASSEMBLY/lNSTALLATION (CONT)
MAINTENANCE OF PRESSURE RELIEF VALVE
DISASSEMBLY - TM-9-2350-238-34-2_177
INSPECTION/REPAIR - TM-9-2350-238-34-2_178
REASSEMBLY - TM-9-2350-238-34-2_179
ADJUSTMENT - TM-9-2350-238-34-2_180
ADJUSTMENT (cont) - TM-9-2350-238-34-2_181
ADJUSTMENT (cont) - TM-9-2350-238-34-2_182
ADJUSTMENT (cont) - TM-9-2350-238-34-2_183
ADJUSTMENT (cont) - TM-9-2350-238-34-2_184
ADJUSTMENT (cont) - TM-9-2350-238-34-2_185
ADJUSTMENT (cont) - TM-9-2350-238-34-2_186
ADJUSTMENT (cont) - TM-9-2350-238-34-2_187
ADJUSTMENT (cont) - TM-9-2350-238-34-2_188
ADJUSTMENT (cont) - TM-9-2350-238-34-2_189
MAINTENANCE OF CHECK VALVE 12253779-1 AND CHECK VALVE
INSPECTION/REPAIR - TM-9-2350-238-34-2_191
MAINTENANCE OF PRESSURE RELIEF VALVE 12253778-1 AND PRESSURE RELIEF VALVE
DISASSEMBLY - TM-9-2350-238-34-2_193
INSPECTION/REPAIR - TM-9-2350-238-34-2_194
ADJUSTMENT OF CHECK VALVE
ADJUSTMENT OF CHECK VALVE (cont)
ADJUSTMENT OF BOOM CYLINDER PRESSURE RELIEF VALVE
ADJUSTMENT OF BOOM CYLINDER PRESSURE RELIEF VALVE (cont)
ADJUSTMENT OF TOW WINCH PRESSURE RELIEF VALVE
ADJUSTMENT OF TOW WINCH PRESSURE RELIEF VALVE (cont)
ADJUSTMENT OF TOW WINCH PRESSURE
ADJUSTMENT OF BOOM WINCH PRESSURE RELIEF VALVE
ADJUSTMENT OF BOOM WINCH PRESSURE RELIEF VALVE (cont) - TM-9-2350-238-34-2_203
ADJUSTMENT OF BOOM WINCH PRESSURE RELIEF VALVE (cont) - TM-9-2350-238-34-2_204
MAINTENANCE OF HYDRAULIC FLOW DIVIDER MANIFOLD AND HYDRAULIC
REMOVAL/DISASSEMBLY - TM-9-2350-238-34-2_206
REMOVAL/DISASSEMBLY (cont) - TM-9-2350-238-34-2_207
INSPECTION/REPAIR - TM-9-2350-238-34-2_208
REASSEMBLY/INSTALLATION - TM-9-2350-238-34-2_209
REASSEMBLY/INSTALLATION (cont) - TM-9-2350-238-34-2_210
REASSEMBLY/INSTALLATION (cont) - TM-9-2350-238-34-2_211
MAINTENANCE OF RELIEF VALVE
INSPECTION/REPAIR - TM-9-2350-238-34-2_213
ADJUSTMENT - TM-9-2350-238-34-2_214
ADJUSTMENT (cont) - TM-9-2350-238-34-2_215
ADJUSTMENT (cont) - TM-9-2350-238-34-2_216
MAINTENANCE OF CHECK VALVE
INSPECTION/REPAIR - TM-9-2350-238-34-2_218
DISASSEMBLY - TM-9-2350-238-34-2_219
INSPECTION/REPAIR - TM-9-2350-238-34-2_220
MAINTENANCE OF SOLENOID VALVE
INSPECTION/REPAIR - TM-9-2350-238-34-2_222
REASSEMBLY - TM-9-2350-238-34-2_223
HIGH-PRESSURE SETTING ADJUSTMENT
HIGH-PRESSURE SETTING ADJUSTMENT (cont) - TM-9-2350-238-34-2_225
HIGH-PRESSURE SETTING ADJUSTMENT )HIGH-PRESSURE SETTING ADJUSTMENT (cont)
HIGH-PRESSURE SETTING ADJUSTMENT (cont) - TM-9-2350-238-34-2_227
HIGH-PRESSURE SETTING ADJUSTMENT (cont) - TM-9-2350-238-34-2_228
LOW PRESSURE SETTING CHECK
MAINTENANCE OF TURRET TRAVERSE CONTROL DIRECTIONAL LINEAR VALVE AND SPOOL ASSEMBLY
REMOVAL - TM-9-2350-238-34-2_231
INSPECTION/REPAIR - TM-9-2350-238-34-2_232
REASSEMBLY - TM-9-2350-238-34-2_233
INSTALLATION - TM-9-2350-238-34-2_234
MAINTENANCE OF TRAVERSING SYSTEM INSTALLATION
REMOVAL - TM-9-2350-238-34-2_236
REMOVAL (cont)
INSTALLATION - TM-9-2350-238-34-2_238
INSTALLATION (cont) - TM-9-2350-238-34-2_239
MAINTENANCE OF CAB TRAVERSING UNIT AND PRIMARY PLANETARY SPEED GEAR ASSEMBLY
DISASSEMBLY - TM-9-2350-238-34-2_241
DISASSEMBLY (cont) - TM-9-2350-238-34-2_242
DISASSEMBLY (cont) - TM-9-2350-238-34-2_243
DISASSEMBLY (cont) - TM-9-2350-238-34-2_244
DISASSEMBLY (cont) - TM-9-2350-238-34-2_245
DISASSEMBLY (cont) - TM-9-2350-238-34-2_246
DISASSEMBLY (cont) - TM-9-2350-238-34-2_247
DISASSEMBLY (cont) - TM-9-2350-238-34-2_248
DISASSEMBLY (cont) - TM-9-2350-238-34-2_249
INSPECTION/REPAIR - TM-9-2350-238-34-2_250
REASSEMBLY (CONT) - TM-9-2350-238-34-2_251
REASSEMBLY (CONT) - TM-9-2350-238-34-2_252
REASSEMBLY (CONT) - TM-9-2350-238-34-2_253
REASSEMBLY (CONT) - TM-9-2350-238-34-2_254
REASSEMBLY (CONT) - TM-9-2350-238-34-2_255
REASSEMBLY (CONT) - TM-9-2350-238-34-2_256
REASSEMBLY (CONT) - TM-9-2350-238-34-2_257
REASSEMBLY (CONT) - TM-9-2350-238-34-2_258
REASSEMBLY (CONT) - TM-9-2350-238-34-2_259
MAINTENANCE OF TRAVERSING HYDRAULIC MOTOR
DISASSEMBLY - TM-9-2350-238-34-2_261
DISASSEMBLY (cont) - TM-9-2350-238-34-2_262
INSPECTION/REPAIR - TM-9-2350-238-34-2_263
INSPECTION/REPAIR (cont) - TM-9-2350-238-34-2_264
REASSEMBLY (CONT) - TM-9-2350-238-34-2_265
REASSEMBLY (CONT) - TM-9-2350-238-34-2_266
DISASSEMBLY - TM-9-2350-238-34-2_267
DISASSEMBLY (cont) - TM-9-2350-238-34-2_268
DISASSEMBLY (CONT)
INSPECTION/REPAIR - TM-9-2350-238-34-2_270
REASSEMBLY - TM-9-2350-238-34-2_271
REASSEMBLY (cont) - TM-9-2350-238-34-2_272
REASSEMBLY (CONT) - TM-9-2350-238-34-2_273
REASSEMBLY (CONT) - TM-9-2350-238-34-2_274
MAINTENANCE OF CAB ASSEMBLY
REMOVAL - TM-9-2350-238-34-2_276
REMOVAL (cont) - TM-9-2350-238-34-2_277
INSPECTION/REPAIR - TM-9-2350-238-34-2_278
INSTALLATION - TM-9-2350-238-34-2_279
INSTALLATION (cont) - TM-9-2350-238-34-2_280
INSTALLATION (cont) - TM-9-2350-238-34-2_281
INSTALLATION - TM-9-2350-238-34-2_282
REMOVAL - TM-9-2350-238-34-2_283
DISASSEMBLY - TM-9-2350-238-34-2_284
DISASSEMBLY (cont) - TM-9-2350-238-34-2_285
DISASSEMBLY (cont) - TM-9-2350-238-34-2_286
DISASSEMBLY (CONT) - TM-9-2350-238-34-2_287
INSPECTION/REPAIR - TM-9-2350-238-34-2_288
TM-9-2350-238-34-2_289
REASSEMBLY - TM-9-2350-238-34-2_290
REASSEMBLY (CONT) - TM-9-2350-238-34-2_291
REASSEMBLY (CONT) - TM-9-2350-238-34-2_292
REASSEMBLY (CONT) - TM-9-2350-238-34-2_293
INSTALLATION - TM-9-2350-238-34-2_294
INSTALLATION (cont) - TM-9-2350-238-34-2_295
APPENDIX A REFERENCES - TM-9-2350-238-34-2_297
TECHNICAL MANUALS (cont)
Section 1. INTRODUCTION
ADHESIVE SILICONE
LUBRICATING OIL
APPENDIX C ILLUSTRATED LIST OF MANUFACTURED ITEMS
Figure 2. Pipe With Cutout.
APPENDIX D TORQUE VALUES
TORQUE VALUE GUIDE (CONT)
SPECIAL TOOLS AND EQUIPMENT
SPECIAL TOOLS AND EQUIPMENT (CONT) - TM-9-2350-238-34-2_307
SPECIAL TOOLS AND EQUIPMENT (CONT) - TM-9-2350-238-34-2_308
SPECIAL TOOLS AND EQUIPMENT (CONT) - TM-9-2350-238-34-2_309
SPECIAL TOOLS AND EQUIPMENT (CONT) - TM-9-2350-238-34-2_310
SPECIAL TOOLS AND EQUIPMENT (CONT) - TM-9-2350-238-34-2_311
SPECIAL TOOLS AND EQUIPMENT (CONT) - TM-9-2350-238-34-2_312
ALPHABETICAL INDEX - TM-9-2350-238-34-2_313
ALPHABETICAL INDEX (cont) - TM-9-2350-238-34-2_314
ALPHABETICAL INDEX (cont) - TM-9-2350-238-34-2_315
ALPHABETICAL INDEX (cont) - TM-9-2350-238-34-2_316
ALPHABETICAL INDEX - TM-9-2350-238-34-2_317
ALPHABETICAL INDEX (cont) - TM-9-2350-238-34-2_318
diagram - TM-9-2350-238-34-2_319
diagram - TM-9-2350-238-34-2_320
diagram
metric chart