TM 9-2350-238-34-2
2-28. MAINTENANCE OF BOOM AND WINCH-CONTROL CYLINDERS AND AT-
TACHING PARTS AND BOOM CONTROL CYLINDER ASSEMBLY (CONT).
BOOM DROP RATE TEST (CONT)
21 Repeat steps 8 thru 19 for 15 ton (1 3.6 metric ton) load. (See chart C.)
22 Secure single boom block (4) to vehicle.
23 Push BOOM WINCH control handle (3) to
LOWER until boom is in STOW position.
24 Release BOOM WINCH control handle
(3).
2-102