TM 9-2350-238-34-2
2-29. MAINTENANCE
INSTALLATION (CONT)
OF BOOM AND WINCHTOW WINCH ASSEMBLY (CONT).
4 Roll vehicle tow drum winch (1) up lumber
to front of cab into position for
installation.
5 Pass sling through boom winch opening
and attach to hoist.
6 Lift vehicle tow drum winch (1), remove
lumber, and lower tow drum winch into
position into floor of cab.
7 Install eight new Iockwashers (2) and
eight hexagon head capscrews (3). Torque
hexagon head capscrews to 580 to 620
ft-lb (786 to 841 N-m).
2-108