TM 9-2350-238-34-22-22. MAINTENANCE OF BOOM AND WINCH–VEHICLE DRUM WINCH.This task covers: a. R e m o v a lb. Inspection/Repairc.InstallationINITIAL SETUPTools and Special ToolsGeneral mechanic’s tool kit, automotive(SC-5180-90-CL-N26)Lumber, 4 x 4Shop equipment, automotive mainte-nance and repair: field maintenance,basic, less power (SC 4910-95-A31)Key set, socket head screwWrench set, socket, 3/4-in. squaredriveWrench, torque, O to 600 ft-lbShop equipment, automotive mainte-nance and repair: supplemental no. 1,less power (SC 4910-95-A62)Hoist, chain, 6000 lb (2724 kg)Sling (RE1-91-16018)Materials/PartsLockwasher (8) (MS35338-48)Lockwasher (4) (MS35338-53)Lockwasher (4) (MS35338-67)Motor to winch gasket (1090871 O)Personnel Required3ReferencesTM 9-2350-238-20-2TM 9-2350-238-24P-2Equipment ConditionsUnion to boom winch motor and nippleto winch motor metal tube assembliesdisconnected (TM 9-2350-238-20-2)Brake cylinder to selector valve metaltube assembly removed (TM 9-2350-238-20-2)Boom winch cover removed (TM 9-2350-238-20-2)Boom removed (TM 9-2350-238-20-2)Boom winch cable removed (TM 9-2350-238-20-2)General Safety InstructionsUse hoist with lifting capacityof 2000 lb (908 kg) to preventinjury to personnel and damageto equipment.Vehicle drum winch assemblyweighs approximately 400 lb(182 kg); use care when remov-ing or installing. Failure toobserve this warning couldresult in injury to personnel anddamage to equipment.2-38
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business