TM 9-2350-256-20-2
0205 00
11. Connect two connectors (3 and 4) to gage panel to bulkhead wiring harness (25).
12. Connect connector (2) to dome light (24).
13. Connect connector (1) to rigger's service light switch (23).
14. Install 11 clamps (20) using screw (21) and lockwasher (22) for each.
NOTE
Follow-on maintenance: Install air inlet grille if removed (see WP 0342 00).
END OF WORK PACKAGE
0205 00-9/10 blank