TM 9-2350-256-20-2
0221 00
Removal
1.
Remove eight clamps (9) by removing screw (10) and lockwasher (11) from each.
2.
Disconnect connector (1) from bulkhead disconnect (12).
3.
Disconnect five connectors (2 through 6) from bulkhead to main engine bracket and rear fuel tank transmitter wiring harness
(13).
4.
Disconnect two connectors (7 and 8) from bulkhead to APU, master relay, and rigger's lights wiring harness (14).
0221 00-3