TM 9-2350-256-20-2
0231 00
Removal
1.
Disconnect connector (1) from switch panel to neutral safety to bulkhead wiring harness (3).
2.
Disconnect connector (2) from circuit breaker (4).
Disassembly
1.
Disassemble lead assembly (see WP 0255 00 thru 0264 00, as appropriate).
Assembly
1.
Assemble lead assembly (see WP 0255 00 thru 0264 00, as appropriate).
Installation
Connect connector (2) to circuit breaker (4).
1.
Connect connector (1) to switch panel to neutral safety to bulkhead wiring harness (3).
2.
END OF WORK PACKAGE
0231 00-2