TM 9-2350-256-20-2
0283 00
6.
Lubricate threads of 10 dowels (15) with GAA grease and install remaining dowel nuts (8). Torque dowel nuts to 450470
lb-ft (610637 Nm). Wait 3 minutes and retighten dowel nuts. Wait one minute and check torque again.
7.
Install outer sprocket (6), 11 bushings (4), and 11 bolts (3) to track-drive hub (9). Torque bolts to 225250 lb-ft (305339
Nm).
8.
Lubricate threads of 11 bolts (3) and 11 nuts (5) with GAA grease and install nuts. Torque nuts to 7090 lb-ft (95122 Nm).
9.
Install hinged rear fender (2) with seven screws (1).
NOTE
Follow-on maintenance: Connect track (refer to TM 9-2350-256-10).
END OF WORK PACKAGE
0283 00-5/6 blank