CHAPTER 9: MAINTENANCE OF HULL- AND CAB-RELATED COMPONENTS
TM 9-2350-256-20
9-4 REPLACE U-35 WINCH CENTER RIGHT FLOOR PLATE
THIS TASK COVERS
a. Removal
b. Installation
INITIAL SET-UP
Tools:
Parts:
Equipment Condition:
Tool kit, general mechanic's
Lockwashers (8) (Appendix G,
Floor-mounted bracket
(Appendix C, item 53)
item 118)
removed (see paragraph 9-106)
a. REMOVAL
1
Remove two screws (1), two lockwashers (2), and two flat washers (3).
2
Remove two screws (4) and two lockwashers (5).
3
Remove four screws (6), four lockwashers (7), four flat washers (8), and floor plate (9).
b. INSTALLATION
1
Install floor plate (9) with four flat washers (8), four new lockwashers (7), and four screws (6).
2
Install two new lockwashers (5) and two screws (4).
3
Install two screws (1), two new lockwashers (2), and two flat washers (3).
NOTE
Follow-on maintenance:
Install floor-mounted bracket (see paragraph 9-106)
9-6