TM 9-2350-256-34-2Figure 3-24. Disassembly of Hoist Winch Assembly into Subassemblies.cTest. Before installing cable on winch, the wire rope assembly is to be tested to 17,400 lb prior to attachingferrule on winch end, with the clevis installed and the winch end clamped.3-21Assembly of Hoist Winch Assembly from SubassembliesAssemble the hoist winch assembly in reverse order of disassembly (fig. 3-24).3-21.1 Adjustment of Hoist WinchValves are adjusted by the vehicle manufacturer. Should verification need to be made, refer to paragraph 2-21 forprocedure.a.Deleted.b.Deleted.c.Deleted.d.Deleted.3-21.2 Adjustment of Live Boom CapabilityRefer to paragraph 2-22 for adjustment procedure.TA171855CHANGE 4 3-36.1/(3-36.2 blank)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business