• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Installation - TM-9-2350-292-20-2_1086
Installation - TM-9-2350-292-20-2_1088

TM-9-2350-292-20-2 Recovery Vehicle Heavy Full-Tracked: M88A2 (NSN 2350-01-390-4683) (EIC:ACQ) Manual
Page Navigation
  1046    1047    1048    1049    1050  1051  1052    1053    1054    1055    1056  
TM 9--2350--292--20--2 0643 00--1 AUXILIARY POWER UNIT WIRING HARNESS 3W704 REPLACEMENT (HATZ) 0643 00 THIS WORK PACKAGE COVERS: Removal, Installation INITIAL SETUP: Tools and Special Tools General mechanic’s tool kit (item 1, WP 0717 00) Materials/Parts Adhesive (item 102, WP 0716 00) Marker tags (item 49, WP 0716 00) Equipment Conditions Battery power disconnected (WP 0256 00) APU cover removed (WP 0413 00) Removal NOTE Tag all electrical connections and electrical leads prior to removal to aid in installation. Where applicable, remove adhesive to expose desig- nated electrical terminals. 1.   Disconnect wiring harness 3W704 wire 420 (1) from oil pressure sending unit (2). 2.   Disconnect wiring harness 3W704 wire 420A (3) from low oil pressure switch (4). 3.   Disconnect wiring harness 3W704 wire 493 (5) at wire junction of lead assembly 3W705 (6) for high air tempera- ture switch. 4.   Remove wiring harness 3W704 (7) from APU assembly. 5.   Inspect all parts for damage and replace as required. 1 2 6 5 7 4 3







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.