TM 1-1680-320-13&P
HIGH PERFORMANCE RESCUE HOIST ASSEMBLY
OPERATION UNDER UNUSUAL CONDITIONS
SECURITY MEASURES FOR ELECTRONIC DATA
Not Applicable
COLD WEATHER
WARNINGS
Static electricity generated by helicopter should be discharged before
attempting a sling or rescue hoist pickup. Use a conductor between
Caution must be exercised when transporting external loads that exhibit
unstable characteristics. These loads may amplify any oscillation and cause
load to contact the helicopter.
High Performance Rescue Hoist Assembly shall be serviced with hydraulic fluid, MIL-PRF-5606, prior to/during
operations in conditions below -40 F.
EMERGENCY PROCEDURES
Emergency procedures can be found in the following manuals:
TM 55-1520-210-10 (UH-1)
TM 1-1520-237-10 (UH-60)
End of Work Package
0006 00-1/(0006 00-2 blank)