TM 9-2350-256-10Section II. DEEP WATER FORDING4-6. INSPECTION OF DEEP WATER FORDING KIT INSTALLATION.a.Inspection.Check kit installation to ensure all parts have been installed. Ensure all necessary areas have beensealed or taped and attaching hardware (screws, clamps) are present and tight. Ensure equipment removed fromvehicle for fording has been properly stowed.NOTEIf you plan on fording in a sandy area over 56 in. (1.42 m) deep for a long time,remove engine compartment hull access plates before entering water. This allowssand to drain out instead of building up and binding controls when leaving water.b.Bilge Pump Operation.Ensure bilge pump works before entering water. Turn BILGE PUMP switch (1) ON ataccessories control panel (2). BILGE PUMP indicator light (3) should come on and there should be no unusualnoises from pump. Turn BILGE PUMP switch to OFF when pump is checked.4-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business