TM 9-2350-256-20-1
0099 00
6.
Install hose (12), two clamps (13), and filter assembly (14) to turbocharger (15).
Testing
1.
Place throttle control lever (16) and fuel shutoff control lever (17) in open position.
Start engine and observe gages, warning lights, and powerplant for proper operation with the aid of assistant.
2.
Place throttle control lever (16) at fast idle for 5 seconds. Release and allow powerplant to warm up to 140240 degrees
3.
Fahrenheit ( F) (60116 Celsius [C] ). Observe gages and warning lights.
Place fuel shutoff control lever (17) in closed position to stop engine.
4.
0099 00-3