TM 9-2350-256-20-1
UNIT MAINTENANCE
RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1
GROUNDHOP MAINTENANCE
INSTALLATION, TESTING, REMOVAL
INITIAL SETUP:
Tools and Special Tools
Tools and Special Tools (cont.)
Tool kit, general mechanic's (item 59, WP 0490 00)
Hose assembly, engine primer (item 25, WP 0490 00)
Cable assembly, accessories (item 5, WP 0490 00)
Hose assembly, main fuel line and fuel injector return
Cable assembly, generator armature (item 6, WP 0490
(item 26, WP 0490 00)
00)
Personnel Required
Cable assembly, ground (item 7, WP 0490 00)
Cable assembly, starter (item 8, WP 0490 00)
Mechanics (2)
Clamp (item 10, WP 0490 00)
Equipment Condition
Filter assembly (item 15, WP 0490 00)
Hose (item 21, WP 0490 00)
0099 00-1