TM 9-2350-256-20-2
0202 00
7.
Connect connector (5) to bilge pump circuit breaker to switch panel lead assembly (21).
8.
Connect connectors (2, 3, and 4) to accessories panel wiring harness (20).
9.
Install connector (1) with gasket (19) to bulkhead (16) using four lockwashers (18) and four screws (17).
10. Install 30 clamps (13) using lockwasher (15) and screw (14) for each.
NOTE
Follow-on maintenance: Install air cleaner assembly (see WP 0137 00).
END OF WORK PACKAGE
0202 00-6