TM 9-2350-256-20-2
0208 00
4.
Connect connector (26) to engine oil pressure sending unit (62).
5.
Install ground lead (25) using nut (61).
6.
Connect connector (24) to time totalizing meter (60).
7.
Connect connector (23) to engine oil temperature sending unit (59).
8.
Connect connector (22) to engine high oil temperature switch (58).
Install ground lead (21) to engine (36) using two washers (57) and bolt (56).
9.
10. Connect connector (20) to left side manifold preheat coil (55).
11. Install ground lead (19) to engine (36) using screw (53) and two lockwashers (54).
12. Connect connector (18) to generator blower motor (52).
0208 00-8