TM 9-2350-256-20-2
0239 00
3.
Disconnect two leads (2 and 3) from starter (12) by removing nut (13) and lockwasher (14).
Disassembly
1.
Disassemble ground cable (see WP 0255 00 thru 0264 00, as appropriate).
Assembly
1.
Assemble ground cable (see WP 0255 00 thru 0264 00, as appropriate).
Installation
1.
Connect two leads (2 and 3) to starter (12) using lockwasher (14) and nut (13).
2.
Connect connector (1) to engine disconnect (8) using four nuts (11), four lockwashers (10), and four screws (9).
3.
Install clamp (5) using lockwasher (7) and screw (6).
NOTE
Follow-on maintenance: Install powerplant (see WP 0098 00).
END OF WORK PACKAGE
0239 00-3/4 blank