TM 9-2350-256-20-2
UNIT MAINTENANCE
RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1
SEALING INSPECTION
INITIAL SETUP:
Tools and Special Tools
References
TM 9-2350-256-10
Inspection-Acceptance and Rejection Criteria
When time and facilities permit, engine compartment should be flooded with water. At this time, a thorough inspection should
be made at bulkhead and power takeoff drive shaft cover to determine any leaks. Engine should be operated (refer to TM
9-2350-256-10) to detect any malfunctions as a result of water leakage.
NOTE
Remove and stow two access plates from underside of engine compartment. This is done to prevent
buildup of sand during fording operations.
END OF WORK PACKAGE
0478 00-1/2 blank