SECTION I: CAB SUBFLOOR PLATES AND SUPPORTS
TM 9-2350-256-20
9-21 REPLACE/REPAIR STOWAGE BASKET FORWARD INTERMEDIATE LEFT
FLOOR PLATE
THIS TASK COVERS
a. Removal
b. Disassembly
c. Assembly
d. Installation
INITIAL SET-UP
Tools:
Parts:
Equipment Conditions:
Tool kit, general mechanic's
*Lockwashers (4) (Appendix G,
Spare headlight mounts
(Appendix C, item 53)
item 118)
removed (see paragraph 6-29)
Riveter, blind (Appendix C,
*Rivets (4) (Appendix G, item 238)
Floor and light mount plate
item 42)
removed (see paragraph 9-22)
Personnel seat removed (see
paragraph 9-64)
a. REMOVAL
1
Disconnect wiring harness 10894546/450A (1) and lead 518 (2).
2
Remove grommet (3).
3
Remove hoist winch shift lever knob (4).
4
Remove four screws (5), four lockwashers (6), four flat washers (7), and floor plate (8).
9-23