TM 9--2350--292--10ASSEMBLY AND PREPARATION FOR USE.0010 00THIS WORK PACKAGE COVERS:Assembly and Preparation for Use, Initial Adjustments, Checks, and Self--TestINITIAL SETUP:Tools and Special ToolBasic Issue Items (BII) (Table 2, WP 0128 00)Personnel RequiredThreeReferencesWP 0101 00WP 0128 00ASSEMBLY AND PREPARATION FOR USEWhen a new vehicle is received by the unit, it must be thoroughly inspected. If anything is wrong with the vehicle,record it on DA Form 2404. Check the vehicle for completeness of assembly. Make sure that all equipment andcontrols are present and in good shape. Check the Components of End Item (COEI) and Basic Issue Items (BII)against the list in WP 0128 00 to be sure they are all present. Stow all COEI and BII in their designated stowagelocations.INITIAL ADJUSTMENTS, CHECKS, AND SELF--TESTPerform all BEFORE operation checks and services in the Preventive Maintenance Checks and Services (PMCS)(Table 1, WP 0101 00).END OF TASK0010 00--1/2 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business