TM 9--2350--292--10
ASSEMBLY AND PREPARATION FOR USE.
0010 00
THIS WORK PACKAGE COVERS:
Assembly and Preparation for Use, Initial Adjustments, Checks, and Self--Test
INITIAL SETUP:
Tools and Special Tool
Basic Issue Items (BII) (Table 2, WP 0128 00)
Personnel Required
Three
References
WP 0101 00
WP 0128 00
ASSEMBLY AND PREPARATION FOR USE
When a new vehicle is received by the unit, it must be thoroughly inspected. If anything is wrong with the vehicle,
record it on DA Form 2404. Check the vehicle for completeness of assembly. Make sure that all equipment and
controls are present and in good shape. Check the Components of End Item (COEI) and Basic Issue Items (BII)
against the list in WP 0128 00 to be sure they are all present. Stow all COEI and BII in their designated stowage
locations.
INITIAL ADJUSTMENTS, CHECKS, AND SELF--TEST
Perform all BEFORE operation checks and services in the Preventive Maintenance Checks and Services (PMCS)
(Table 1, WP 0101 00).
END OF TASK
0010 00--1/2 blank