TM 9--2350--292--20--1
0187 00--56
0187 00
PREVENTIVE MAINTENANCE CHECKS AND SERVICES INCLUDING
LUBRICATION INSTRUCTIONS -- CONTINUED
TABLE 2 PREVENTIVE MAINTENANCE CHECKS AND SERVICES
INCLUDING LUBRICATION INSTRUCTIONS, MONTHLY -- CONTINUED
ITEM
NO.
NOT FULLY
MISSION
CAPABLE
IF:
PROCEDURE
LOCATION
ITEM TO
CHECK/
SERVICE
INTERVAL
MONTHLY
INTERIOR
15
Power Takeoff
(PTO) Shaft and
Universal Joint
a. Open subfloor plate #27 (1)
(WP 0454 00).
b. Loosen boot clamp (2), pull boot (3) back
to gain access to universal joint (4).
c. Pull and hold manual fuel shutoff lever
and bump starter button
(TM 9--2350--292--10). Rotate universal joint
(4) to gain access to two fittings (5).
Clogged,
damaged or
missing
grease
fittings or
boot.
LUBRICANTS/
COMPONENTS
REFILL
CAPACITY
EXPECTED TEMPERATURE*
+40°F to --10°F
(+4°C to --23°C)
Above +32°F
(Above 0°C)
0°F to --65°F
(--17°C to --54°C)
GREASE:
Automotive and
Artillery Grease,
(GAA),
MIL--G--10924
As
Required
*For Arctic Operation, refer to FM 9--207
ALL TEMPERATURES
d. Lubricate with GAA through two fittings
(5) until grease is visible.
e. Wipe excess grease with rag
(item 7, WP 0716 00).
f. Install boot (3) over universal joint (4)
and secure with clamp (2).
g. Close subfloor plate #27 (1)
(WP 0454 00).
2
3
1
5
4