Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Removal (cont) - TM-9-2350-292-20-2_1332
Removal (cont) - TM-9-2350-292-20-2_1334
TM-9-2350-292-20-2 Recovery Vehicle Heavy Full-Tracked: M88A2 (NSN 2350-01-390-4683) (EIC:ACQ) Manual
Page Navigation
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
TM 9--2350--292--20--2
0691 00--3
LEFT AND RIGHT SIDE BOOM LIMIT VALVE TRANSDUCER, SWITCHES AND
ASSOCIATED PARTS REPLACEMENT -- CONTINUED
0691 00
Removal--Continued
1. Remove wiring harness 3W501 connector P2 (1) from switch 3S510 (2).
2. Remove switch 3S510 (2) with straight swivel adapter (3) from straight adapter (4) then remove straight swivel
adapter (3) from switch 3S510 (2).
3.
Remove hose
(5) from straight swivel adapter (6).
4. Remove straight swivel adapter (6), straight adapter (4), tee (7) from right side boom limit valve (8).
5. Remove preformed packing (9) from straight swivel adapter (3). Discard preformed packing.
1
2
3
4
5
6
7
8
9
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business