TM 9-2350-256-34
INTERMEDIATE MAINTENANCE
RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1
HOIST WINCH MOTOR REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
References
Materials/Parts
Equipment Condition
NOTE
LOAD TEST REQUIREMENT--Load testing of hoist winch is mandatory, prior to use, following re-
placement of the hoist winch motor.
Load testing will be accomplished by support maintenance activities.
Refer to the TESTING section in WP 0053 00 for the detailed step-by-step procedure.
Removal
1.
Disconnect hydraulic line (1) from adapter union (2).
2.
Remove seven screws (3), lockwashers (4), and manifold (5). Discard lockwashers.
3.
Remove and discard two packings (hidden) (6).
4.
Remove adapter union (2).
5.
Remove four screws (7), lockwashers (8), motor (9), pilot ring (hidden) (10), and gasket (11). Discard lockwashers and
gasket.
0054 00-1