TM 1-1680-320-13&P
0001 00
HIGH PERFORMANCE RESCUE HOIST ASSEMBLY
PREPARATION FOR STORAGE OR SHIPMENT
INITIAL SETUP
Personnel Required: 2
References:
UH-1: 15N, Helicopter Repairer
Standard Practice for Commercial Packing
UH-60: 15T, Helicopter Repairer
ASTM D 3951
Hoist Certified: 91W, Flight Medic
Functional Users Manual for the Army
Maintenance Management System Aviation
Parts/Materials:
DA PAM 738-751
Reusable Shipping Container, 42305R11
Military Marking for Shipment and Storage
MIL-STD-129
Tools and Special Tools:
AVUM/AVIM Manual for General Aircraft
N/A
Maintenance TM 1-1500-204-23 series
Avionic Cleaning and Corrosion
Prevention/Control TM 1-1500-344-23 series
INSPECTION
Inspect hoist for damage in accordance with inspection criteria in WP0012 00. If hoist has been damaged, report
damage on two material condition tags in accordance with DA PAM 738-751. Attach one tag directly onto hoist.
Attach second tag to outside of reusable shipping container after installation of hoist. Ensure tags are secured in
such a manner that will afford maximum protection from handling and weather.
NOTE
Do not remove any forms or tags that are attached to hoist until after aircraft
installation.
1. Inventory hoist against packing slip and check all tags and forms accompanying hoist assembly.
Report inventory discrepancies by submitting a Supply Discrepancy Report (SDR), form SF 364,
electronically: https://aeps.ria.army.mil.
2. Inspect for damage incurred during shipment.
Report damage by submitting a Product Quality Deficiency Report (PQDR), form SF 368, electronically:
https://aeps.ria.army.mil.
PRESERVATION
Rescue hoist shall be packaged in accordance with MIL-STD-129.