TM 1-1680-320-13&P
0028 00
INSTALLATION
NOTES
Install umbilical cable bracket with raised edge facing upward.
Forward bolts, spacers, and washers will be installed and all bolts will be
torqued during boomhead assembly installation.
1. Install upper support (1), bracket (2), and handles (3) on winch assembly (4) by installing spacers (7),
washers (6), and aft bolts (5). Do not torque aft bolts at this time.
2. Install boomhead support assembly in accordance with WP 0018 00.
3. Install cable cutter assembly in accordance with WP 0017 00.
4. Install cable assembly in accordance with WP 0016 00.
5. Install cable hook assembly in accordance with WP 0015 00.
6. Swing handles inboard and install forward spacers (7), washers (6), and bolts (5).
7. Torque forward and aft bolts 160-190 in. lbs.
End of Work Package