TM 9-2350-238-34-2
2-32. MAINTENANCE OF STAGE TWO CARRIER ASSEMBLY (CONT).
REASSEMBLY (CONT)
5 Using hammer and punch, peen lip of
each of three spur gears (5) in four equal-
ly spaced places around each of three an-
nular ball bearings (4).
Make sure each planet gear headless
straight pin is installed in same hole
from which it was removed during
disassembly.
6 Install three spur gears (5) with two flat
washers (6) each, in carrier (3), and
secure in place with three planet gear
headless straight pins (7).
NOTE
l If a new carrier is used, drill and
tap a 0.250-in. (0.635-cm), 28
UNF-2B hole 0.375 in. (0.953
cm) deep between each planet
gear headless straight pin and
carrier.
l If only new planet gear headless
straight pins are used, drill and
tap a new hole between each
new planet gear headless
straight pin and carrier. Drill
new holes approximately 180
degrees from old holes.
OLD HOLE
NEW HOLE
7 Install three setscrews (8) in carrier (3).
Tighten and stake each setscrew.
2-140