TM 9-2350-238-34-22-32. MAINTENANCE OF STAGE TWO CARRIER ASSEMBLY (CONT).REASSEMBLY (CONT)5 Using hammer and punch, peen lip ofeach of three spur gears (5) in four equal-ly spaced places around each of three an-nular ball bearings (4).Make sure each planet gear headlessstraight pin is installed in same holefrom which it was removed duringdisassembly.6 Install three spur gears (5) with two flatwashers (6) each, in carrier (3), andsecure in place with three planet gearheadless straight pins (7).NOTEl If a new carrier is used, drill andtap a 0.250-in. (0.635-cm), 28UNF-2B hole 0.375 in. (0.953cm) deep between each planetgear headless straight pin andcarrier.l If only new planet gear headlessstraight pins are used, drill andtap a new hole between eachnew planet gear headlessstraight pin and carrier. Drillnew holes approximately 180degrees from old holes.OLD HOLENEW HOLE7 Install three setscrews (8) in carrier (3).Tighten and stake each setscrew.2-140
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business