TM 9-2350-238-34-22-33. MAINTENANCE OF STAGE THREE CARRIER ASSEMBLY (CONT).REASSEMBLY (CONT)5 Using hammer and punch, peen lip ofeach of three planet pinion gears (5) infour equally spaced places around eachroller bearing (4).6 Install three planet pinion gears (5) and sixpinion gear flat washers (6) each, in car-rier (3).7 Install three new gear pins (7) in carrier(3).NOTEl If a new carrier is used, drill andtap a 0.250-in.(0.635-cm), 28UNF-2B hole 0.375 in. (0.953cm) deep between each gearpin and carrier.l If only new gear pins are used,drill and tap a new hole be-tween each new gear pin andcarrier. Drill new holes approx-imately 180 degrees from oldholes.OLD HOLES8 Install three new setscrews (8) in carrier(3). Tighten and stake each newsetscrew.NEW HOLES2-144
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business