TM 9-2350-238-34-24 Install flat washer (5) and retaining ring(6) on rigid shaft coupling (3).I5 Install rigid shaft coupling (3) in carrier(7).6 Coat bores of three planet pinion gears (8)with grease (item 9, appx B).7 Install three rows of 47 new rollers (9)separated by four new washers (10) intobores of three planet pinion gears (8).2-149
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business